In a $1.4 million project, Facilities Services recently replaced one of its five chillers in its central steam plant. The chiller, weighing several hundred tons, was carefully installed in sections with large parts lifted in by crane. The machine will support most of campus with chilled water and air conditioning by removing liquid heat using vapor compression and reducing energy through solar power. It will assist the central steam plant in storing over seven million gallons of water at 38 degrees in underground tanks. Large pumps assist with utility distribution through underground pipes and is monitored around the clock with sophisticated BEST control technology. The chiller it replaced was over 30 years old and required significantly more energy. It took extensive coordination to dissemble, remove and replace. 

Chiller Replacement
Chiller Replacement
The pouring of new foundation for the replacement chiller; bigger feet require bigger shoes.
Chiller Replacement
The new Chiller arrives at Central Plant.
Chiller Replacement
The new Chiller is brought in sections and assembled.
Chiller Replacement
Piping is installed connecting to existing systems.
Chiller Replacement
 A new 4160 volt start is installed; big chillers require a lot of juice.
Chiller Replacement
Marco Lemus pushes the button to start the new chiller.
Chiller Replacement
The new chiller runs smoothly and efficiently.

More Information

General Campus Information

University of California, Riverside
900 University Ave.
Riverside, CA 92521
Tel: (951) 827-1012

Career OpportunitiesUCR Libraries
Campus StatusMaps and Directions

Department Information

Facilities Services
3401 Watkins Drive

Tel: (951) 827-4214 (M-F 8:00 AM - 5:00 PM)
(951) 827-4677 (Emergencies at other times)
Fax: (951) 827-3651
E-mail: Contact Us

Footer